Beginning Monday, April 15, 2024, San Bar Construction, Inc. will be performing pavement striping maintenance work on various Las Cruces streets.
Source: City of Las Cruces
The work will be done during varying working hours with day operations between 7 a.m. and 5 p.m. and overnight operations from 7 p.m. to 6 a.m. All roads will remain open to traffic with intermittent lane closures.
The project is expected to be completed by Friday, June 14, 2024.
Driveways to residences and businesses will remain accessible. RoadRUNNER Transit routes will not be affected. Striping maintenance work will occur on roads within all City Council districts.
These city streets will be striped between Monday, April 15, 2024, and Tuesday, April 30, 2024. This list is subject to change.
- Crawford Boulevard: From the north frontage road to Zia Boulevard.
- Valley Drive: From Hoagland Avenue to Picacho Avenue.
- Valley Drive: From Picacho Avenue to Avenida de Mesilla.
- Missouri Avenue: From Telshor Boulevard to Candeleras Street.
- Calle Jitas: From Sonoma Ranch Boulevard to Calle Abuelo.
- Sonoma Ranch Boulevard: From Lohman Avenue to Sonoma Ranch Boulevard.
- Mission Road: From Roadrunner Parkway to Golf Club Road.
- Golf Club Road: From Roadrunner Parkway to Sonoma Ranch Boulevard.
- Engler Road: From 600 feet west of Sonoma Ranch Boulevard to Calle Pico Gemelo.
- Doña Ana Road/Three Crosses Avenue: From Alameda Boulevard to the city limits.
- Temple Street: From Lenox Avenue to Topley Avenue.
- Roadrunner Parkway: From Bataan Memorial West to Engler Road.
- Roadrunner Parkway: From Golf Club Road to Bataan Memorial East.
- Porter Drive: From Bataan Memorial West to Peachtree Hills Road.
- El Paseo Road: From Main Street to Boutz Road.
- Farney Lane: From El Paseo Road to Espina Street.
For information, call the Public Works Department/Traffic Management at (575) 541-2505. The TTY number is (575) 541-2182.